City of Calabasas, CA
Home MenuSolarAPP+
SolarAPP+ Automated Solar Plan Reviews
Before applying for an automated solar plan review and solar permit, projects must follow certain requirements. At this time, SolarAPP+ is designed to provide a code-compliance check for the majority of residential, roof-mounted, retrofit photovoltaic systems. To see which systems are eligible, please refer to the Eligibility Checklists. Only projects that conform to this lists are eligible to use the automated SolarAPP+ portal for instant permitting.
1. How to Start Using SolarApp+
- Register through the SolarAPP+ Registration Webpage.
- If already registered, please skip to step 2.
2. Submit for Automated Review through SolarAPP+
- To start using SolarAPP+, log in and submit your design through the SolarAPP+ Webpage.
- A processing fee from SolarAPP+ and City of Calabasas permit fees will be charged.
- Download the approved PDF letter and plans.
- Apply for a SolarAPP+ permit through our City of Calabasas portal with upload SolarAPP+ approval confirmation letter and reference solar plan set.
- You will receive a confirmation email from SmartGov portal confirming application submittal.
- Once application paperwork is deemed complete by City Staff, The city of Calabasas will issue the permit to the contractor or the authorized agent via email.
3. Schedule an Inspection:
- Inspections are available during normal City business hours and can be requested for morning (8:00 a.m. to 12:00 p.m.) or afternoon (11:00 a.m. to 4:00 p.m.). (requested timeframes are not guaranteed.)
- Please have the City of Calabasas permit number, type of inspection requested, address, site contact name and contact phone number.
- Please schedule inspections using the City’s online portal. Online inspections can be scheduled up until 3:00 p.m. the day before your scheduled inspection date.
- Scheduled inspection timeframes will be emailed by our SmartGov software around 8:30AM on the day of the requested inspection. The online portal will also have the timeframes available to be viewed once you login.
Types of Solar Projects and Eligibility Requirements
|
Solar Panel System Sizes |
Residential Roof |
All Ground Mounted Solar |
Commercial Roof Mounted |
All Parking Shade Structures |
|---|---|---|---|---|
| 1.0 – 38.4 kW (A/C) |
State Solar Permit*(NewSolarAPP+) |
Standard Permit | Standard Permit | Standard Permit |
|
38.5 kW (A/C) or more |
Standard Permit | Standard Permit | Standard Permit | Standard Permit |
Additional Solar Application Requirements
Work NOT Covered By SolarAPP+
In addition to the information shown in the Solar eligibility table above, the following PV work related items will not be covered through the SolarAPP+ review program.
- PV systems interconnecting with main panel busbars exceeding 225A
- Re-roofing permit (Class A)
SolarApp+ Tutorials
- What is SolarAPP+?
- Where is SolarAPP+ available?
- What projects qualify to be submitted in SolarAPP+?
- Is there a limit on system size SolarAPP+ can review?
- How much does SolarAPP+ cost an installer to use?
- How do I register with SolarAPP+?
- How do I submit a project through SolarAPP+?
- How do I make changes to approved SolarAPP+ plans?
- Being prepared for Solarapp+ inspection.
- Contractors Guide: Release notes
