PKWY CALABASAS/US101 S/B-OFF RAMP INTERSECTION MODIFICATIONS
GENERAL PROJECT INFORMATION
Project Title:

Parkway Calabasas/US101 S/B Off-Ramp Intersection Modifications

Location:

The intersection of Calabasas Road and US 101 S/B on-ramp

Construction Start Date:

May 2015 UPDATED

Duration:

Four months

Contact: Tatiana Holden - tholden@cityofcalabasas.com

The southbound interchange at Parkway Calabasas/US 101 will be redesigned for improved traffic flow and safety by extending the left turn lane and providing pedestrian and bicycle improvements.

Intersection enhancements will also include traffic signal modifications and equipment upgrades. The proposed sidewalk will connect existing pedestrian facilities west and east of the intersection. A continental striping pattern will be used for the crosswalk. A landscaped median with a pedestrian pathway will provide pedestrians with a continuous sidewalk along Calabasas Road.

Miscellaneous construction elements include curbs, gutters, curb ramps, traffic signs and striping.

The latest project update was given at the February 24, 2015 Traffic and Transportation Commission meeting. NEW

The bid opening is scheduled for April 7, 2015 @ 2:15 PM.

Copies of the plans, specifications, and contract documents are available at the Calabasas City Hall. NEW