CALABASAS RD. RESURFACING/MICRO-SURFACING PROJECT

GENERAL PROJECT INFORMATION

Project Title:

Calabasas Rd. Resurfacing/Micro-Surfacing Project

Location:

Calabasas Rd. from Mureau Rd. to US101 Freeway On & Off Ramps

Construction Dates:

Start Construction May 12, 2016 and Finish no later than May 27, 2016.

Duration:

12 Working Days

Contractor:

Excel Paving Co.

Contact:

Bryan Salguero bsalguero@cityofcalabasas.com

Project Description:

Work includes asphalt cold-milling and asphalt rubberized hot mix (ARHM) overlay, removals and reconstruction of pavement sections, micro-surfacing/slurry of existing pavement and striping.

Phase 1 will be crack sealing within the project limits.

Phase 2 will be set from Mureau Rd to end of the Auto Gallery dealership.

Phase 3 will be from the previously Sperling Nursery to the first driveway of the Mini Cooper dealership.

Phase 4 will micro-surface/slurry the remaining asphalt within the project limits.

PLEASE DRIVE SAFELY and be aware for uneven pavement and debris.