2012 ANNUAL CITYWIDE RESURFACING PROJECT

    

GENERAL PROJECT INFORMATION
Project Title:

2012 Annual Citywide Resurfacing Project

Location:

Deer Springs neighborhood and the intersection of Mulholland Highway and Eddingham Avenue

Approvals: City Council on April 25, 2012
Construction Start Date:

June 13, 2012

Duration:

Three months

Contact: Tatiana Holden, tholden@cityofcalabasas.com

September 2012

Resurfacing work in Deer Springs neighborhood has been completed. The Contractor will move to the intersection of Mulholland Highway and Eddingham Avenue next week. The work at this location will start on September 26 and continue for five days.

June 2012

The 2012 Annual Citywide Resurfacing Project includes road resurfacing in the Deer Springs community. The project will use Asphalt Rubberized Hot Mix (ARHM), which is proven to be very effective in residential areas. ARHM elongates the lifespan of roads and provides a suitable surface for cars to drive on. Some benefits of ARHM are: increased elasticity and resilience at high temperatures; improved durability; improved resistance to fatigue/reflection cracking due to higher binder contents; and significant reduction in traffic noise.

City of Calabasas 2014