GENERAL
PROJECT INFORMATION |
|
Project Title: |
2012 Annual
Citywide Resurfacing Project |
|
Location: |
Deer Springs neighborhood and the
intersection of Mulholland Highway and Eddingham Avenue
|
|
Approvals:
|
City Council on
April 25, 2012 |
|
Construction
Start Date: |
June 13, 2012
|
|
Duration: |
Three months |
|
Contact: |
Tatiana Holden,
tholden@cityofcalabasas.com |
September 2012
Resurfacing work in Deer Springs neighborhood has been completed.
The Contractor will move to the intersection of Mulholland Highway
and Eddingham Avenue next week. The work at this location will start
on September 26 and continue for five days.
June 2012
The 2012 Annual Citywide Resurfacing Project
includes road resurfacing in the Deer Springs community. The project
will use Asphalt Rubberized Hot Mix (ARHM), which is proven to be
very effective in residential areas. ARHM elongates the lifespan of
roads and provides a suitable surface for cars to drive on. Some
benefits of ARHM are: increased elasticity and resilience at high
temperatures; improved durability; improved resistance to
fatigue/reflection cracking due to higher binder contents; and
significant reduction in traffic noise. |
 |
|