2011 ANNUAL CITYWIDE RESURFACING PROJECT

    

GENERAL PROJECT INFORMATION
Project Title:

2011 Annual Citywide Resurfacing Project

Location:
 

Saratoga Hills/Saratoga Ranch; Mulholland Hwy; Lost Hills Rd.; Park Mirasol: Las Virgenes

Construction Start Date:

August 2, 2011

Duration:

Three months

Contact: Tatiana Holden, tholden@cityofcalabasas.com

Project Schedule (PDF)

The 2011 Annual Citywide Resurfacing Project includes road resurfacing in the Saratoga Hills and Saratoga Ranch communities. All streets in the area, including Canwood Street and Parkville Road, will receive a FiberMat w/Type II Slurry pavement treatment with preliminary roadway preparation by crack sealing. Mulholland Hwy from Old Topanga Canyon Road to the South City limit will be microsurfaced. Mulholland Hwy from Paul Revere Rd to Eddingham Ave is scheduled for base repairs and a microsurfacing top course.

 

Three other locations include sections of Lost Hills Road from Agoura Road to Cold Springs Street, Park Mirasol, and Las Virgenes Road from Thousand Oaks Blvd to 900' north of Thousand Oaks Blvd. The project will use Asphalt Rubberized Hot Mix (ARHM), which is proven to be very effective in residential areas. ARHM elongates the lifespan of roads and provides a suitable surface for cars to drive on. Some benefits of ARHM are: increased elasticity and resilience at high temperatures; improved durability; improved resistance to fatigue/reflection cracking due to higher binder contents; and significant reduction in traffic noise.

 

Please be advised of traffic delays on Mulholland Highway later this and earlier next week. Work on section between Old Topanga Canyon Road and the Southern City limit has been rescheduled to October 7th, 10th and 11th due the chance of rain on Thursday, October 6th.

City of Calabasas 2014