EXPEDITED ELECTRIC VEHICLE CHARGING STATION PERMITTING PROGRAM - STEP 5

STEP 5

Electrical load calculation is required. The electrical load calculation worksheet is intended for residential projects, non-residential projects are required to provide their own load calculation.

If a single-line diagram is required, please include the main service rating, the wire size and type, the charger amperage and voltage and any separate disconnects with the corresponding rating.

Please complete the worksheet with the project specific values Electrical Load Worksheet 

 

 